A quay construction (approximately 70 m1 in length) was designed for a project in Cuba.
The quay is used for mooring vessels with a draught of less than 2,5 m.
The quay construction consists of a sheet piling anchored with tie rods and an anchor wall. The top of the quay has a concrete reinforced floor, on which light equipment (work traffic) can appear.