The underpass (Works 16) was designed as a two-lane road with the option of an expansion of two more lanes. The railway deck is made of prestressed concrete trough beam with cast rails. The abutments are based on tubex piles, and anchored to retaining structures in the slope of the railway embankment. The tunnel body consists of a reinforced concrete floor and walls and has a foundation of tension piles.